Monday, October 19, 2009



Kevin stopping his interior sanding so we can come onboard.

                                                                                                  
Port stateroom computer/printer stand and shelving.
                                                                                                                                                                                                          
                                                                                                                                                                                                                                                                                                                                                                                                                                               Starboard cabinet below and shelving above.




Fenceboard veneer with a story to come soon.

Tony, Bird (Troy White) and Mat discussing the perfect layout for the flybridge helm seat, access hatch, table, benches and lockable storage.




Beginning of the flybridge seating.  Helm seat facing forward plus there will be a rear facing seat with two side benches and room for table.
                                                          Layout looking at rear of fybridge helm seats and benches.

To right lays the flybridge canopy.  We have our first major problem.  The metal fabricator who could/should have built the canopy supports, cockpit supports, ladder to the flybrige and hand rails has not returned any phone calls from Tony in over the last week.  The entire project is about to become dead in the water unless we can get a fabricator started ASAP.  All of this time I have been worried about the windows not showing up.  Now the focus has changed completely.  Stay tuned!

1 comment:

  1. This is Garon testing to see if I can post a commnet. I will be choosing "anonymous" in the "comments as" section below.

    ReplyDelete